Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Dec 25, 2019     Corteced the inside of the elevator skin - (1 hour)       Category: Empennage
Brushed on the cortec (cut 50/50 with water) on all of the interior joint locations of the elevator skin.

NOTE: Gads I think I must need a 'minder'. At one point I dumped my paint reservoir on my pants...so the wife gave me a pair of sweatpants and said "Don't get anything on this" to which I pointedly said "Dahh". I then immediately ran a swipe down the elevator cutout channel (6T6-3), turned it over, and swiped down the other side, rubbing it on my pants leg (DOH!!). So I changed again (needed to toss those in the wash before the water-soluble primer dried). All good...working along, leaned down to look at a hard to see area and promply dipped my hair in the paint reservoir (see pic of paint reservoir)!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.